Groundbreaking Ceremony for the
New Product Technology Center (PTC) at Frei
Lacke

Start of a Pioneering Construction Project at the Döggingen Site

With the ceremonial groundbreaking ceremony, FreiLacke officially kicked off construction of its new Product Technology Center (PTC). The three-story building, featuring state-of-the-art laboratory and application technology, is being built within the factory premises and is scheduled to be ready for occupancy in early 2027.

The PTC will become the technical heart of the company: In addition to spacious laboratories for development, a modern technical center and a central training center will be built. There, customers can not only receive practical training but also experience and test the use of FreiLacke’s coating systems using the latest application technology.

Groundbraking: from left to right: Anna Gut, Paul Wenzinger, Jörg Müller, Daniel Buchner, Herr Stumpp, Construction manager Stefan Wurm, Roland Bäurer, Dr. Rainer Frei, Johannes Behringer, Niklas Kaltenbrunner, Jürgen Schoner (company PGS), Micha Bächle, Hans-Peter Frei, Peter Gärtner (architec), Dr. Georg Baum (mayor)

Background & Motivation

With the new building, FreiLacke is responding to the growing demands in product development and customer support. Technical center space previously spread across various buildings will be consolidated, while simultaneously efficiently meeting the growing demand for customer training. The PTC will also create additional office and laboratory space and resolve existing capacity bottlenecks.

 

Architecture & Project Details

The building will be constructed on a footprint of approximately 550 m² per floor and will comprise three floors plus a technical building. Its architecture is modeled on FreiLacke’s administrative building and will be fully barrier-free – including an elevator and a connection to the existing laboratory building, which will also be barrier-free in the future.

Sustainability is a priority in the planning:

  • State-of-the-art, energy-efficient building services with heat pump technology
  • Energy integration with existing buildings for minimal energy consumption increases despite additional space
  • Implementation of current ecological standards

 

Project partners

FreiLacke is working with experienced partners for the implementation:

  • Architecture: Schmelzle + Partner
  • Building services planning: Planungsgruppe Schnepf
  • Structural engineering: Buchner Bauingenieure
  • Shell construction: Stumpp Bauunternehmen
  • Civil engineering: Behringer

Furthermore, there is close coordination with the city and municipality of Döggingen, where the project was presented at an early stage.

The new Product Technology Center (PTC) is scheduled for completion in early 2027.

Your direct contact

Oliver Zanner

Leiter Marketing
Head of Marketing

+49 7707 151 2270
oliver.zanner@freilacke.de

Do you have general questions?

We look forward to hearing from you.

General questions
Information material
product enquiries
Scroll to Top